Like Watching Paint Dry
Tonight’s excitement — painting the station some more. Just about all the parts are painted, so, tomorrow night I should be able to assemble the station.
I also determined that I want to build the station with its included base for strength, especially since this is to be used on one of the modules. Of course, the station floor is supposed to be flush with the platform, which meant a modification to the platform was in order. Using the base as a guide, I scribed the opening in the decking with an X-Acto knife, and then cut away the decking and one layer of the supporting Fomecore.
The base of the station is a snug fit in the hole, and the floor lines up just right! While it probably won’t be seen once the station is assembled onto the base, I went ahead and touched up the two raw-wood bits around the edges.
After “date night” with Donna tomorrow night, I’ll assemble the station, and we’ll see how it looks!


